anthonyupton.com

  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Portfolio
  • Tumblr Blog
  • About
  • Contact
  • Facebook
  • Twitter
x
Wonderhatch
Image 2 of 113
Prev Next
Less

Corporate0010

Corporate0010.JPG

Add to Lightbox Download
twitterlinkedinfacebook

20040423 Picture by Ant Upton ©.The Blades are put on the new Wind Turbine at the Ford Dagenham Plant in East London today, Friday..The Turbines erected by Ecotricity are the first in Greater London and are 85 metres high and will provide 100% of the electirity requirements of Ford's new Clean Room Assembly Hall..This image is copyright Anthony Upton 2004©. and the author is asserting his full Moral Rights in relation to the publication of this image. All rights reserved..Rights for onward transmission of any image or file is not granted or implied. .Changing or deleting Copyright Information is illegal as specified in the Copyright,Design and Patents Act 1988.

Copyright
Anthony Upton 2010 © All Rights Reserved
Image Size
1000x652 / 433.8KB
http://www.anthonyupton.com
Keywords
Anthony Upton, Portfolio, London, West London
20040423                 Picture by Ant Upton ©.The Blades are put on the new Wind Turbine at the Ford Dagenham Plant in East London today, Friday..The Turbines erected by Ecotricity are the first in Greater London and are 85 metres high and will provide 100% of the electirity requirements of Ford's new Clean Room Assembly Hall..This image is copyright Anthony Upton 2004©. and the author is asserting his full Moral Rights in relation to the publication of this image. All rights reserved..Rights for onward transmission of any image or file is not granted or implied.  .Changing or deleting Copyright Information is illegal as specified in the Copyright,Design and Patents Act 1988.